Recent Bathroom Remodel Projects
Explore some of our favorite full-house transformations — from complete modern makeovers to classic redesigns.
Mercer Island
From Traditional to Trendy: Mercer Island Bathroom Renovation
Why Choose Armada for Your Bathroom Remodel
Remodeling a bathroom is a major investment — and it requires a partner who can handle every detail from start to finish
A bathroom packs more trades into a small space than any other room — here’s what keeps ours sound for decades, not seasons.
Here’s why homeowners across King County choose Armada Build:
WHAT OUR CLIENTS SAY
Awards & Credentials


Our Process
From Vision to Reality
From Vision to Reality
Remodeling your entire home can feel overwhelming — but with Armada, it’s easy and organized.
Book your free consultation with armada build today
Book your free consultation with armada build today

Our design and build team will visit your home, discuss your vision, and prepare a detailed plan and quote — no commitment required.

Your Bathroom Remodel, Week by Week
A bathroom remodel takes a room you use every day out of commission, so the honest question is always "how long?" Most single-bathroom renovations run four to six weeks of active construction once materials are on hand. Here's how that time breaks down — and why the weeks before demo matter as much as the ones during.
Before Demo
Design & Ordering
Layout, tile plan, fixture selections, and a full material schedule locked in. Long-lead items — custom vanity, glass, specialty tile — ordered before demo so nothing stalls mid-project.
Week 1
Demo & Assessment
Tear-out to studs and subfloor. We assess for moisture damage, rot, and inadequate prior waterproofing before anything new goes in — the discovery window.
Week 1–2
Rough-In
Plumbing and electrical rough-in, any framing changes, blocking for grab bars or benches. Inspection before walls close.
Week 2–3
Waterproof & Tile
Continuous membrane on all wet areas, tile backer, then tile setting and grout. The stage that most determines how the bathroom holds up.
Week 3–5
Finishes
Vanity, countertop, drywall and paint, plumbing and electrical trim, mirrors, and accessories installed.
Week 5–6
Glass & Walkthrough
Frameless glass templated and installed (it's fabricated to the finished opening), then a full punch-list walkthrough before we call it done.
Primary suites with steam, double vanities, or structural changes run longer; powder rooms run shorter. Permit review for plumbing relocation typically adds three to five weeks up front and runs in parallel with design.
Bathrooms Designed to Work for the Long Term
The bathroom is where most home accessibility concerns start — and a remodel is the natural moment to build in features that keep the space safe and usable for decades, whether for aging parents, a multigenerational household, or simply planning ahead. Done well, none of this reads as clinical; it just reads as a well-designed bathroom. The key is that the structural groundwork happens during the remodel, when the walls are open, not as an expensive retrofit later.
Curbless Showers
A zero-threshold, roll-in shower with a linear drain removes the step-over entirely. It's the single most impactful accessibility feature — and it happens to be one of the most sought-after contemporary looks, so it serves both goals at once.
Grab-Bar Blocking
We install solid blocking behind the walls at shower, tub, and toilet locations while they're open. Even if you don't want visible bars now, the reinforcement is there for the day you do — no wall demolition required.
Comfort-Height Fixtures
Comfort-height toilets, appropriately positioned vanities, and lever-handle faucets reduce strain and are easier for everyone to use — subtle choices that make daily use easier without announcing themselves.
Bench Seating & Handheld Sprays
A built-in tiled bench and a handheld shower on a slide bar add flexibility and safety in the shower, and they're standard features in a well-designed primary suite regardless of age.
Slip-Resistant Flooring
Textured porcelain and appropriately sized floor tile improve traction where it matters most. We specify slip resistance intentionally rather than treating it as an afterthought.
Wider Doorways & Clear Turning Space
Where the layout allows, widening the doorway and preserving clear floor space makes the room work for a walker or wheelchair — worth designing in even if it's not needed yet.
Bathroom Remodeling FAQ
How long does a bathroom remodel take?
Most single-bathroom renovations run four to six weeks of active construction once materials are on site. Primary suites with steam showers, double vanities, or structural changes take longer; powder rooms take less. The design and ordering phase happens before demo begins, and if plumbing relocation requires a permit, that review typically adds three to five weeks up front — though it runs in parallel with design so it rarely extends the overall timeline.
Do I need a permit to remodel my bathroom?
In Washington State, moving plumbing, altering electrical, or making structural changes requires a permit. A cosmetic refresh that keeps every fixture in place often does not. We verify the requirement for your specific scope, prepare and submit the permit package, and manage review through approval so you're not dealing with the building department. Skipping required permits creates disclosure obligations when you sell and can force removal of finished work for inspection.
Can you move the toilet, shower, or sink to a new location?
Yes. Relocating fixtures is common in bathroom remodels — especially converting a tub/shower combo to a walk-in shower or reconfiguring a cramped layout. It involves rerouting supply and drain lines, which is where permitting and proper inspection come in. The feasibility and cost depend on where the plumbing stack and floor joists run, which we assess during the site visit before committing to a layout.
Should I choose a tub or a walk-in shower for resale?
The general guidance is that a home should retain at least one bathtub — usually in a hall or family bath — for buyers with young children. In a primary suite, converting an unused tub to a large walk-in shower is increasingly what buyers prefer and rarely hurts resale. If you have multiple bathrooms, you have flexibility; if you have only one, keeping a tub is the safer resale choice.
What's the most important thing to get right in a bathroom remodel?
Waterproofing. Everything you see — the tile, the vanity, the glass — sits on top of work you can't inspect once it's done. A continuous waterproof membrane on every wet area, integrated at the curb, corners, and drain, is what separates a bathroom that lasts twenty years from one that fails in three. It's also the corner most often cut by contractors competing on price. Ask any contractor to name their waterproofing system specifically.
Can I use my bathroom during the remodel?
Not the one being renovated — it's out of service from demo through final trim. If it's your only bathroom, we work with you on sequencing to minimize the days without a functional toilet and shower, and some clients arrange a temporary setup. Homes with a second bathroom generally experience the project as a manageable inconvenience rather than a disruption.
Do you handle everything, or do I need to hire a designer and plumber separately?
We handle all of it under one contract — design, permitting, demolition, plumbing, electrical, waterproofing, tile, cabinetry, and glass — with a single project manager. You don't coordinate between a designer, a general contractor, and a series of subcontractors. That single point of accountability is the core of the design-build model and is especially valuable in bathrooms, where trade sequencing is tight and mistakes get covered by the next trade's work.